One ERP. Every Industry. Global Presence. Powered by Azaalea AI
22272e9fb58a47b7d605950c6cdff7b550d0b71e
eresource Nfra · Industrial & Infrastructure ERP

ERP for Industrial & Infrastructure Projects

A heavy-civil and steel-erection driven eresource Nfra ERP solution for industrial and infrastructure contractors

BOQ · RA & Milestone Billing Steel — Fab Yard to Erection Concrete Pours & Batching Cranes & Heavy Lifts Permit-to-Work EHS GST · TDS 194C · e-Way Bill
  • ✓ 20+ Years Industrial ERP
  • ✓ 600+ Contractors Live
  • ✓ Factories · Warehouses · Plants
  • ✓ India · UAE · 25+ Countries
  • ✓ 30-Day Free Trial

Trusted by Leading Companies

onix_logo
roofsol-logo
kshema-logo12

Enquire Now

Fill out the form below to get in touch with us

Trusted by Industry Leaders

ECS Retail Al Laith United Grease & Lubricants Avon Industries PLC BWRO Panaserv Panaserv Group Kewalram Adipro Afcott Fairfield Greenpref Shreeji Parksons Onix Saizar Al Mutawa Metec Yutika BWRL Osswal Nigerchin Kegax Lumax Mar & Mor Tata Steel
One Screen · Every Pour · Every Tonne

Your whole industrial project,
on one screen.

Work-group progress across civil, steel and envelope, tonnage from fabrication yard to erection, pour plans against batching capacity, RA bills and retention — for every structure, every grid line, live.

🏗️
Steel by the tonneEvery member tracked from fabrication and galvanizing through dispatch to erection — reconciled in MT, grid by grid
🧱
Pours that hit windowsConcrete pour cards planned against batching-plant capacity, with cube tests filed to each pour automatically
🤖
AzaaleaGPT watchingRA bills ready, steel dispatches drifting behind erection fronts, permits expiring, pour windows at risk — surfaced early
Industrial DashboardGreenPort Industrial Park · Phase 1
Live
₹342Cr
Contract
₹198Cr
Certified
12,400 MT
Steel Erected
₹9.8Cr
Retention

Work-Group Progress — GreenPort · P1

Piling & Foundations 91%
Structural Steel & PEB Erection 64%
Roofing & Envelope 42%
Industrial Flooring & Finishes 28%
Steel Reconciliation
12,400 / 18,600 MT
Fab yard WIP 2,150 MT · Dispatch OK
Pour Plan — P-42
2,400 cu.m
⚠ Raft B2 · Sat 05:00 · 2 plants + standby
🤖

AzaaleaGPT — RA-14 (₹18.2Cr) ready: measurements certified across piling, steel and envelope — submit before the client's month-end cutoff. Fab-yard dispatch for grids J–L is 260 MT behind the erection front — crane C-2 idles Thursday unless dispatch advances. Hot-work permits for zone B expire tomorrow 18:00 — renewals queued for the client EHS portal.

GST IRN ✓ TDS 194C ✓ BOCW ✓ WPS ✓ Fatoora ✓ UAE VAT ✓
Why eresource Nfra for Industrial Projects

Not adapted.
Built from scratch for industrial & infrastructure contractors.

An industrial project runs on tonnage and pour windows: thousands of MT of steel moving through fabrication, galvanizing and dispatch to meet an erection front; raft pours measured in thousands of cubic metres against batching capacity; and a client whose permit-to-work system stops everything that isn't papered. Generic ERP has never met a fab yard. eresource Nfra was built over 20+ years for exactly this: tonnage-wise tracking, pour-planned execution and audit-grade EHS on one platform.

"On an industrial job the crane is the most expensive thing on site — and it stands idle for two reasons: steel that didn't dispatch, and a permit that didn't renew. eresource Nfra watches both before the crane does."

Why does 20+ years of industrial ERP experience across 25 countries matter?

An RA bill where steel is measured in MT erected — not MT delivered — is the difference between certified and disputed. A pour card without cube results filed against it is a quality claim waiting for DLP. A day of erection without a valid height-work permit is a stop-work notice on a client's factory campus. These are industrial-project realities — and eresource Nfra was built for them alongside project engineers, fab-yard managers and EHS teams for over two decades.

India — GST IRN · TDS 194C · BOCW · e-Way Bill UAE — VAT 5% · WPS · EOSB · Fatoora
Book a Free Demo

India industrial compliance — pre-built

GST e-Invoice IRN TDS 194C · 194I BOCW Cess PF / ESI e-Way Bill (Steel) EMD · BG Tracking

UAE / GCC compliance — pre-built

WPS SIF Payroll EOSB Gratuity FTA Fatoora UAE VAT 5% Daman Health Emiratisation

🏭 8 Industrial Project Stages

01 Tender & Engineering Review→ 02 Enabling & Piling→ 03 Foundations & Heavy Civil→ 04 Structural Steel & PEB Erection→ 05 Roofing, Flooring & Envelope→ 06 Utilities & Equipment Foundations→ 07 Commissioning Support & Handover→ 08 Defect Liability & AMC
Every Industrial & Infrastructure Contractor

If you build it tonne by tonne —
and pour by pour — eresource Nfra is built for you.

Not a generic project ERP. A dedicated industrial platform — with tonnage-wise steel tracking, pour planning, RA and milestone billing and permit-to-work EHS pre-configured for your project type.

🏭 Factories & Manufacturing Plants Greenfield & brownfield · Equipment foundations · PTW clients Popular
📦 Warehouses & Logistics Parks Big-box sheds · FM2 flooring · Fast-track programmes Popular
🏗️ PEB Contractors Design-fab-erect · Tonnage-wise tracking · Multi-site erection Popular
🏙️ Industrial Parks & SEZ Works Roads · Drains · Utilities · Plot-level infrastructure
⚡ Power T&D & Substations Switchyards · Control buildings · Transmission civil works
💧 Water & Effluent Plants WTP · STP · CETP · Process civil & hydro-testing
🖥️ Data Centre Construction Heavy slabs · Precision tolerances · MEP-dense coordination
🧊 Cold Storage & Agri Infra Insulated envelopes · Controlled-atmosphere · Silos
🏔️ Cement & Steel Plant Civil Heavy foundations · Silos & hoppers · Shutdown windows
🛢️ Tank Farms & Terminals Tank pads · Bunds · Fire networks · OISD compliance
⚓ Marine & Jetty Works Piling over water · Precast · Tide-window planning
⚙️ Equipment Foundations & Erection Machine foundations · Grouting · Mechanical erection support

Don't see your project type? We very likely serve it.

Talk to a ERP Specialist →
Complete Industrial Project Lifecycle

Every module an industrial contractor needs —
from piling to handover.

From BOQ measurement and RA billing through fab-yard steel tracking, pour and heavy-lift planning and permit-to-work EHS — all in one integrated industrial ERP.

01 📏
Module 01

BOQ, Measurement & RA Billing

Industrial contracts pay on measured work and milestones. Steel is billed by MT erected, concrete by cu.m poured, and every RA bill lands in the client's format — with retention, advance recovery and the e-invoice in the same step.

  • Item-rate & milestone BOQs — structure-wise and grid-wise quantities against the contract
  • Measurement records — steel in MT, concrete in cu.m, with photos and grid references
  • RA bills, client formats — abstracts and annexures the way each client's PMC wants them
  • Retention & GST IRN — held per contract, tracked to release; e-invoice generated with the bill
02 🏗️
Module 02

Procurement, Steel & Fabrication

Steel is the project's biggest number. Track plates and sections from purchase through the fabrication yard — fit-up, welding, galvanizing, dispatch — to erection at grid, reconciled in MT at every stage with committed cost live.

  • Tonnage procurement — steel by section and MT with committed cost from PO day one
  • Fab-yard tracking — fabrication stages per mark number: fit-up, weld, blast, galvanize
  • Dispatch vs erection front — what's on trucks vs what the crane needs next, matched daily
  • e-Way Bill & reconciliation — movement documents and MT reconciled purchase-to-erection
03 🧱
Module 03

Plant, Pours & Heavy Lifts

Big pours and heavy lifts are planned events, not hopes. Pour cards run against batching-plant capacity with standby plans, crane programmes match erection sequences, and hired plant runs with hours, fuel and TDS 194I handled.

  • Pour planning — pour cards with volume, mix, plant allocation and standby arrangements
  • Batching plant control — daily output vs demand; cube tests auto-filed to each pour
  • Crane & lift programmes — heavy lifts scheduled against erection sequence and lift plans
  • Owned & hired plant — hours, fuel and maintenance; TDS 194I on hire bills
04 🦺
Module 04

EHS, Permits & Quality

Industrial clients audit everything. Permit-to-work — height, hot work, confined space — tracked with validity alerts, quality records filed against structures and pours, and NCRs driven to closure with the evidence a client audit expects.

  • Permit-to-work — PTW register with validity windows, renewals and zone-wise status
  • Quality records — cube tests, weld inspections, flooring flatness filed against work
  • NCR management — raised, actioned and closed with photos and sign-offs
  • Client audit trail — every measurement, permit and test retrievable years later

Plus 8 more modules covering the full project lifecycle:

📋 Tendering & EMD/BG 📅 Planning & Programme 🤝 Subcontractors & TDS 🚛 Stores & Materials 📝 Variations & Claims 👤 HR & Payroll 💰 Finance & Tax 🤖 AzaaleaGPT
Explore All ERP Modules →
Mobile App for Industrial Site Teams

Your entire package.
In every team member's pocket.

Industrial projects run across fab yards, grid lines and client EHS portals. eresource Nfra Mobile puts every workflow where the work happens: at the pour, at the crane, at the permit desk.

  • 🧱
    Site engineerExecutes pour cards with cube samples logged · Records steel erection by grid and MT · Raises NCR photos on the spot
  • 📏
    Quantity surveyorMeasurements roll into RA abstracts · Milestone status live · Subcontractor bills certified against measured work
  • 🏗️
    Stores & fab yardSteel GRN by MT with e-Way verification · Mark-number dispatch status · Erection-front demand visible daily
  • 📊
    Project manager / MDTonnage, pours and billing position per project · Permit and audit status · AzaaleaGPT daily briefing
Book Demo
GreenPort · Phase 1 · TodaySite feed

🧱 Pour Completed 07:40

Raft B2 · 2,380 cu.m poured in 14.5 hrs · 2 plants + standby used · 36 cube sets logged · Curing plan active

🏗️ Steel Erected 10:30

84 MT erected grids G–H · Crane C-2 · Mark numbers scanned · Fab-yard dispatch for J–L still 260 MT behind — flagged

🦺 Permits 12:00

Hot-work PTW zone B renewed to Friday · Height permits: 14 active · Client EHS walkdown 15:00 — checklist ready

📏 RA-14 Status 16:20

₹18.2Cr abstract compiled · PMC measurement check Thursday · Retention and advance recovery computed

12,400 MTSteel Erected
2,380 cu.mRaft B2 Poured
₹18.2CrRA-14 Ready
Proven on Real Industrial Projects

Case Studies

Measurable results from industrial and infrastructure contractors running eresource Nfra on live projects.

”

Factory Project · Billing Discipline

Fortis Industrial Builders

RA bill cycle cut by 30% with grid-wise steel and pour measurements flowing straight into client-format bills with retention.

30% Faster RA Bills
”

Logistics Park · Steel Control

Meridian Structures

Crane idle time down 22% — fab-yard dispatch matched to erection fronts daily, with mark-number tracking from weld to grid.

22% Less Crane Idle
The Product Behind This Page

Trusted by Leading Industrial &
Infrastructure Contractors

This industrial edition is built on eresource Nfra — the construction ERP developed over 20+ years, live with 600+ contractors across India, the UAE and 25+ countries. RA billing, fab-yard steel tracking, pour planning and permit-to-work EHS come pre-configured.

From a single factory shed to a multi-site industrial portfolio, the same Nfra platform scales with you — with AzaaleaGPT AI watching tonnage, pours and permits across it all.

Explore Nfra ERP →
FAQ

ERP for industrial & infrastructure — your questions answered.

Five straight answers on steel tracking, RA billing, pours and permit-to-work — from 20+ years of industrial ERP.

Still have questions? Talk to an industrial ERP specialist →
01 What is ERP software for industrial and infrastructure projects?

Industrial and infrastructure ERP manages the full project lifecycle — BOQ measurement and RA billing, tonnage-wise steel from fabrication yard to erection, concrete pour planning and batching control, crane and heavy-lift programmes, permit-to-work EHS and quality records — in one platform. eresource Nfra is built on 20+ years of construction ERP experience with 600+ contractors across India, the UAE and 25+ countries.

02 How is structural steel tracked from fab yard to erection?

Every mark number moves through defined stages — fit-up, welding, blasting, galvanizing, dispatch and erection at grid — reconciled in MT at each step, with e-Way Bills on movements. Dispatch is matched daily to the erection front, so the crane's next requirement is visible before it becomes idle time.

03 How does RA and milestone billing work for industrial contracts?

Measurements are recorded the way the work is done — steel in MT erected, concrete in cu.m poured, with grid references and photos — and roll into RA bills in each client's PMC format with retention and advance recovery applied per contract. The GST e-invoice (IRN) is generated with the bill in one step, and milestone-based contracts bill on certified events.

04 Can it handle permit-to-work and client EHS requirements?

Yes. The PTW register tracks height, hot-work and confined-space permits with validity windows, zone-wise status and renewal alerts, so work never stops for expired paper. Quality records — cube tests, weld inspections, flooring flatness — file against structures and pours, and NCRs are driven to closure with the evidence client audits expect.

05 How fast can we go live, and is there a trial?

An industrial contractor typically goes live in weeks — BOQs imported structure-wise, steel registers set up by mark number, and teams onboarded from site engineer to fab yard to QS. A 30-day free trial is available, pre-configured with measurement, billing, steel and PTW workflows; no credit card required.

🏭 Industrial ERP · 20+ Years · 600+ Contractors

Ready to Transform Your
Industrial Projects?

Transform your industrial and infrastructure projects with a solution that understands tonnage, pour windows and permit-to-work. Contact us for a demo and discover how eresource Nfra can help your company deliver every project smarter, faster, and more profitably.

Book a Demo →

eresource Nfra is India and UAE's ERP for industrial and infrastructure construction — purpose-built over 20+ years for factory and plant builders, warehouse and logistics-park contractors, PEB companies, power T&D and substation works, water and effluent plants, data centres, cold storage, tank farms and heavy equipment foundations. BOQ measurement and RA billing in client formats, tonnage-wise steel tracking from fabrication yard to erection, concrete pour planning with batching control, crane and heavy-lift programmes, permit-to-work EHS and audit-grade quality records end to end — with India (GST e-invoice IRN · TDS 194C/194I · BOCW · e-Way Bill) and UAE (WPS · EOSB · FTA Fatoora · VAT 5%) compliance. 25+ countries. 600+ contractors live. Book a free demo with our industrial ERP specialist team today.

Search

Request Demo Access
Fill in your details

Kindly Submit your details to get the Catalogue