eresource logo
   India's Only Web-Based ERP Solution


Gain Operational Excellence, Implement eresource ERP
Call Sales: +91 22 41118000 / 8049 (50 lines)
 
 
  ERP Categories
 
 ERP on Demand

 Web Based ERP

 ERP in India

 ERP Implementation
  
Methodology

 ERP for SMEs

 ERP Service Provider

 ERP Consultant

 Indigenous ERP

 ERP Features

 ERP Scope

 ERP Software

 ERP System

 ERP Solutions

 SAAS ERP

 CRM Software

 Process Manufacturing

 ERP Software Solution

 
  ERP Related
 
 Production Planning & Control

 Manufacturing Resource
  Planning (MRP II)

 Material Requirement Planning
  (MRP)

 Master Production Schedule

 Customer Relationship
  Management (CRM)

 Bill of Material (BOM)

 Warehouse Management

 Inventory Management

 Purchasing Management

 Shop Floor Control (SFC)

 Capacity Requirements
  Planning (CRP)

 Cost Reporting/Management

 Lot Traceability

 Engineering Change Control

 Repetitive Manufacturing

 HR Management

 Plant Maintenance

 Service Management

 Finance Management

 Purchase Order Management

 Quote Management

 Quality Management

  Download ERP Reports
 
 Sales Reports

 Purchase Reports

 Production Reports

 Finance Reports

 Human Resource Reports
  Home >> Manufacturing >> Screenshots >> Production Planning & Control
 
  Freedom to manage your business from anywhere

  Production Planning and Control

Eresource ERP Production-Planning-Control Module provides capabilities for planning, execution, quality and plant maintenance.

Production Plan in eresource ERP is determined based on Resource Planning, Sales and Operation Planning and Demand of the Product. Having determined the information, eresource ERP generates Master Production Schedule. Following are few screenshots from eresource ERP, which helps identify the resources for MPS. Brief flow chart of eresource ERP, Production Planning and Control algorithm is also given below for your ready reference.

 
  BOM
   
  Fig 1 - Production Planning Data processed from eresource ERP
   
  Batch/Lot manufacturing Register
   
  Fig 2 - Daily Production Scheduling / Creation of Job Card / Batch
   
  Material Requisition
   
  Fig 3 - Work In progress Details (WIP)
   
  Approved Material Receipt
   
  Fig 4 - Machine Capacity Configuration
   
  Goods Issue
   
  Fig 5 - Setting up Item – Machine relationship
   
  Defective Material Dispatch
   
  Fig 6 - Setting up Item – Process Relationship
   
  Shift Handover
   
  Fig 7 - Production Planning and Control (Simplified) in eresource ERP
   
 
The framework of Production Planning and Control in eresource is general, and all the three phases must be performed. It support the strategy and tactics pursued by the firm in which they are implemented.

Please Note: In eresource ERP, different manufacturing process, resource required for each manufacturing processes, Machines for different product and processes can all be CONFIGURED with ease. Simply put, eresource offers you the flexibility to adapt business dynamics and it is range compatible.

   
          Utility links:
 Click here to enquire
 Click here to download brochure

Send us your queries
   
*
*
*
*
*
*
*
Industry Verticals:
Annual Turnover:
Planning to implement:
Comment:
 

ERP module view

 
 Sales & Distribution
  Management

 Purchase Management

 Manufacturing, Planning &
  Control

 Total Quality Management

 Inventory Management

 Plant Maintenance

 Excise Management

 Human Resource Management

 Finance Resource
  Management
 



  Upcoming events
 


  

  Trade Show
 




Home | Products | Services | About eresource | FAQ | Contact us | Site Map | Blog
© 2010 eresource Infotech Private Limited. All rights reserved.